Land Fill / Quarry Site

A Tarmac asphalt plant had decided to erect hot bin stores on one of their sites in Lancashire which would enable them to store the product for up to six hours assisting the logistics of the site.

Erecting the new structure would require cutting several large trenches in areas assumed to be heavily populated with buried services.

Due to site conditions and heavy plant movement Site Vision Surveys established a safe system of works before under taking the survey.

The detection of services was achieved by electro-magnetic and ground probing radar techniques with the final results being delivered to site in hard copy format.